The Tar and Chip Process

PROFESSIONAL CONSTRUCTION has more than 20 Years of Paving Experience. We are your Local Experts!

1

Step 1

Tar and Chip is applied directly over the existing base (such as Blacktop Concrete or Stone) driveway with proper clean up and grading.

2

Step 2

A layer of Hot Liquid Asphalt is applied ontop of the surface.

3

Step 3

A layer of chip stone is then spread over the Hot Tar and raked.

4

Step 4

The chips are embedded into the tar with a vibratory roller for compaction.