The Tar and Chip Process
PROFESSIONAL CONSTRUCTION has more than 20 Years of Paving Experience. We are your Local Experts!
1
Step 1
Tar and Chip is applied directly over the existing base (such as Blacktop Concrete or Stone) driveway with proper clean up and grading.
2
Step 2
A layer of Hot Liquid Asphalt is applied ontop of the surface.
3
Step 3
A layer of chip stone is then spread over the Hot Tar and raked.
4
Step 4
The chips are embedded into the tar with a vibratory roller for compaction.